3 amazing Geoplast port projects
23 January 2024


Modulo
The builders of the Panama Cruise Terminal needed a solution for raising the port surface by 0.5m. Modulo allowed a fast and simple installation of an 8.500 m2 arrival area, helping build the terminal in a timely manner.

Geopanel
The Naples Port worksite was located in a confined space over water, excluding the use of heavy formwork and mechanical equipment. Geopanel was made of lightweight recycled plastic that allowed easy manual installation and reduced the use of machinery to a minimum.

New Nautilus Evo
The Palermo Port project required a time- and cost-efficient solution for lightening the dock’s concrete slab. Our consulting team suggested the New Nautilus Evo for fast and easy logistics, installation, and improved sustainability of the project.