Install New Elevetor in 5 easy steps

Install New Elevetor in 5 easy steps

New Elevetor consists of only 3 modular elements, which makes it extremely simple to install, even in the most demanding projects.

In Padua, New Elevetor allowed a fast and easy construction of a 3.000 m2 refrigeration storage, while simultaneously fulfilling multiple complex requirements:

  • Raising the concrete slab from the ground to prevent frost-heaving,
  • Providing natural ventilation to save the cost of underfloor heating,
  • Creating crawl spaces for the passage of the MEP systems.

The installation was carried out by following these 5 simple steps:

1 LAY THE GRID
1 LAY THE GRID
The workers first created the base grid by placing and connecting the pedestals together.
2 INSTALL MEP
2 INSTALL MEP
The base grid served as a guiding grid for an easier and more precise installation of MEP systems.
3 PLACE THE TUBES
3 PLACE THE TUBES
The tubes were cut to size according to project requirements and fitted into base pedestals.
4 INSTALL FORMWORK
4 INSTALL FORMWORK
The top formwork was placed on the tubes and then interlocked to provide safe walkability.
5 POUR THE CONCRETE
5 POUR THE CONCRETE
The rebar mesh was placed on top of the formwork, upon which the concrete was poured and vibrated.