Municipal swimming pool renovation, Bazas, France
![Municipal swimming pool renovation, Bazas, France](/images/projects/15d2ba3f9cb7cec7bc322df9dd28ee03.jpg)
![Eleveation of the foudantion of a swimming pool in France](/images/projects/6f055ef6c3b21863edc88135286ff1ca.jpg)
![New Elevetor for a swimmin pool in France](/images/projects/87a446a96bd5d420d54787cb5c64e322.jpg)
![Elevation of the foundations in Bazas France at the municipal pool](/images/projects/7da2bfb5b9a77eea1ac903b9ef98741a.jpg)
New Elevetor was used during the renovation of a municipal swimming pool in Bazas in the South-West of France. During the renovation, the pool's floor is raised from 4.5 m to 2.2 m, allowing for substantial savings of the amount of water.
This project was designed by the Bordeaux architectural agency Blamm and represents an investment of 1,450,000 € for the community. Reopening is expected by mid-July 2017.